Site situated in Chittagong, Bangladesh
Supply of 200MW electricity to Bangladesh national grid
Total of 154 Diesel-Powered Gensets (1 – 1.5 MW each) were utilized
60-day Lead time for Enercon scope
All equipment are to be containerized for easy transportation
– 38 sets 40 Ft Containerized E-House
– 4 sets 100kVA Transformers
– 2 sets 500kVA Transformers
– 76 sets 4MVA Transformers
– 76 sets 11kV 630A Switchgears
– 84 sets 11kV 1250A Switchgears
– 4 sets 11kV 4000A Switchgears
– 4 sets PT Panels
– 4 sets Neutral Ground Resistors
– LV MCC Feeder Panels Line-up
– DC Power System
– SCADA System
An integrated resort development, consisting of three hotels (2,100 rooms), casino, water feature park and a retail mall with entertainment complex, 690,000m2
Worked with Meinhardt, renowned consultant in Philippines, for the design and supply of equipment
Total of 13 gensets synchronized together through our control systems
As this is a Casino, the reliability of the control system design was taken into optimum considerations
Zero power failure up till date
– Plant control system design solution
– 13 sets Generator Control Panels
– 1 set Master Control Panel
– 1 set ATS Panel
– 13 sets 34.5kV Switchgears
– 38 sets 13.8kV Switchgears
– 3 sets NGR + NGS Panels
– 13 sets DCT Panels
– DC Power System
– SCADA System
– Yearly Preventive Maintenance
Project Name |
Scope of Supply |
||
1 | Long Son Complex | Design, Supply & Commission of: 1 x MCP c/w redundacy CPU and communication for 4 x Cummins 2.5MW 11.5kV gensets 4 x Neutral Grounding Switch 1 x Neutral Grounding Resistor 4 x MV switchgear 12kV, 1250A |
Marine, Oil & Gas |
2 | Su Tu Trang | Design, Supply & Commission of 1x GCP and 1x LCP for 1x MTU Desiel genset 1375KVA 480V |
Marine, Oil & Gas |
3 | Eastern Refinery Project | Design, Supply & Commission of: 1 x GCP for Mitsubishi 2.5MW 5.5kV gensets 8 x Neutral Grounding Switch 1 x Neutral Grounding Resistor 1 x MV switchgear 7.5kV 1 x Load Shedding Control Panel 1 x Sync Check Control Panel |
Marine, Oil & Gas |
4 | Sensor Tower Plantation | Design, Supply & Commission of: 8 x Stainless Steel SS316L GCP c/w SIL3 Safety Redundancy PLC for 8 x Cummins gensets |
Marine, Oil & Gas |
5 | Su Tu Nau | Design, Supply & Commission of: 2 x GCP c/w SIL2 PLC for 2 x CAT gensets 500kVA 400V |
Marine, Oil & Gas |
6 | Sagar Samrat | Design, Supply & Commission of 3x GCP (ABS Certified) for Cummins gensets 1.0MW (2) 6.6kV and 1.25MW (1) 415V |
Marine, Oil & Gas |
7 | Domgas Agbada | Design, Supply & Commission of 4 x GCP for 1x CAT C15 genset, 50kVA, 400V 3x CAT G3516 genset, 1914KVA, 6.6kV |
Marine, Oil & Gas |
8 | Reggane Nord Development Project | Design, Supply & Commission of 1x GCP with redundant communication for Cummins QSK95 genset, 3125kVA, 5.5kV |
Marine, Oil & Gas |
9 | FPSO Sepia | Design, Supply & Commission of: 2 x ABS Certified GCP c/w redundacy CPU for 2 x MAK 3.375KVA 6.9kV gensets 2 x Neutral Grounding Resistor |
Marine, Oil & Gas |
10 | FPSO Libra | Design, Supply & Commission of: 2 x ABS Certified GCP c/w redundacy CPU and power supply for 2 x MAK 3.375KVA 6.9kV gensets 2 x Neutral Grounding Resistor |
Marine, Oil & Gas |
11 | Cilacap Project | Design, Supply & Commission of: 1 x MCP 4 x GCP c/w redundacy power supply and communication for 4 x Cummins 1.8MW 3.3kV gensets + Neutral Grounding Switch controls |
Marine, Oil & Gas |
12 | Pulau Sambu Project | Design, Supply & Commission of: 1 x MCP 1 x GCP c/w redundacy power supply and communication for 3 x CAT C175 gensets, 2.725MW 3.3kV gensets 3 x Neutral Grounding Switch and Resistor 3 x Engine battery Charger System |
Marine, Oil & Gas |
13 | Coca Cola Project | Design, Supply & Commission of 5 x GCP for CAT 2000kVA(4) & 1000kVA(1), 400V gensets 1 x LV Switchgear Lineup with Main Bus 14000 |
Industrial |
14 | No Bai Airport | Design, Supply & Commission of 1 x MCP and 4 x GCP for CAT 1600kVA, 400V gensets |
Commercial |
15 | Da Nang Airport | Design, Supply & Commission of 1 x MCP and 4 x GCP for CAT genset |
Commercial |
16 | Cam Ranh Airport | Design, Supply & Commission of 1 x MCP and 4 x GCP for CAT genset |
Commercial |
17 | Yangon International Airport | Design, Supply & Commission of 1 x MCP and 3 x GCP for CAT D3512 genset, 1500kVA, 400V Cummins QST30 genset, 1000kVA, 400V 1 x LV Lineup Main Bus 4500A |
Commercial |
18 | St Kitts Electricity (SKELEC) Power Plant | Design, Supply & Commission of 5 x GCP for MAN genset, 4875kVA, 11kV 1 x Neutral Grounding Sstem 4 x MV switchgear 12kV, 630A 1 x MCC system 4 x Battery Charger system 1 x Remote SCADA system |
Power Plant |
19 | City Group | Design, Supply & Commission of: 35 x MV switchgear 12kV, 1250A 1 x Battery System |
Industrial |
20 | Asia Royal Hospital | Design, Supply & Commission of 3 x GCP for CAT 410kVA, 400V gensets |
Industrial |
21 | Nakilat Project | Design, Supply & Commission of: 1 x MCP and 4 x GCP for WEG Motor Genset 1500kVA 11kV gensets 4 x Neutral Grounding Switch 1 x Neutral Grounding Resistor 8 x MV switchgear 11kV, 50Hz 9 x MV switchgear 11kV, 60Hz |
Marine, Oil & Gas |
For more project references, please contact us.